Today my carpenter removed the stairs going from the main floor to the attic. A technician from the elevator company will meet with us here tomorrow to take final measurements of the distances between floors, as well as the thickness of each floor. Fabrication of the elevator shaft segments will begin as soon as these measurements are received at the factory. Time for fabrication should not exceed a month. The actual installation, once all the parts get here, should not take more than two days.
"The world is my country; all of humanity are my brethren; and to do good deeds is my religion." (Thomas Paine)