Our server costs ~$56 per month to run. Please consider donating or becoming a Patron to help keep the site running. Help us gain new members by following us on Twitter and liking our page on Facebook!
Current time: May 25, 2025, 5:34 am

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Green Energy Transmission Line Authorized
#11
RE: Green Energy Transmission Line Authorized
(May 29, 2022 at 1:25 pm)Anomalocaris Wrote:
(May 29, 2022 at 1:16 pm)BrianSoddingBoru4 Wrote: Do you understand the difference between ‘power transmission’ and ‘power production’? The amount of power produced has absolutely nothing to do with the carrying capacity of the transmission lines.

Boru

Yes, I work in the field for a living, and transmission and production has absolutely everything to do one with the other.   How do you think bulk of power gets from where it is produced to where it is consumed?    And why do you think the transmission line facilitates production?

Real transmission systems are not configured so loosening one binding transmission constraint by 1 GW will allow 25GW of additional load to be served across the network.

The article said that the 25GW would be produced, not transmitted. Who said transmission lines facilitate production? Certainly not me.

Boru
‘I can’t be having with this.’ - Esmeralda Weatherwax
Reply



Messages In This Thread
RE: Green Energy Transmission Line Authorized - by BrianSoddingBoru4 - May 29, 2022 at 1:52 pm

Possibly Related Threads...
Thread Author Replies Views Last Post
  Free energy for realz! ignoramus 11 1865 November 26, 2019 at 7:49 am
Last Post: brewer
  Why do Rechargable Batteries Lose Their Capacity to Held Energy? Rhondazvous 6 1846 October 27, 2015 at 1:21 pm
Last Post: Angrboda



Users browsing this thread: 1 Guest(s)