Green Energy Transmission Line Authorized
#13
RE: Green Energy Transmission Line Authorized
(May 29, 2022 at 1:54 pm)BrianSoddingBoru4 Wrote:
(May 29, 2022 at 1:23 pm)Jehanne Wrote: The "It's a start...".

How is the construction of a 400 miles-long power line to transmit renewable energy NOT a start??

Boru

Because, the United States, as a capitalistic society continues to grow, and our consumption of both fossil fuels, and renewable energy also continues to grow. It's pointless to build a renewable energy structure if we end up burning all the World's fossil fuels; there won't be a World left for renewable energy.
Reply



Messages In This Thread
RE: Green Energy Transmission Line Authorized - by Jehanne - May 29, 2022 at 2:18 pm

Possibly Related Threads...
Thread Author Replies Views Last Post
  Free energy for realz! ignoramus 11 1864 November 26, 2019 at 7:49 am
Last Post: brewer
  Why do Rechargable Batteries Lose Their Capacity to Held Energy? Rhondazvous 6 1844 October 27, 2015 at 1:21 pm
Last Post: Angrboda