Our server costs ~$56 per month to run. Please consider donating or becoming a Patron to help keep the site running. Help us gain new members by following us on Twitter and liking our page on Facebook!
Current time: July 25, 2025, 9:08 pm

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Green Energy Transmission Line Authorized
#16
RE: Green Energy Transmission Line Authorized
(May 29, 2022 at 2:41 pm)Anomalocaris Wrote:
(May 29, 2022 at 1:52 pm)BrianSoddingBoru4 Wrote: The article said that the 25GW would be produced, not transmitted. Who said transmission lines facilitate production? Certainly not me.

Boru

Well, you should have said it, because that would suggest you know something about the electrical power systems.  How do you think power gets from where it is produced to where it is consumed?   You think the Wyoming where this transmission project begins, with population much less that of Honolulu, will consume the 25GW locally, “Behind the meter” as the industry would say?   If so what difference does the transmission project make?

You have to produce power before you can transmit it (although you can certainly build both together). You - deliberately or not - misconstrued what was said in the article.

Wyoming has a population of just over 580 000. Honolulu has a population of about 350 000.

Boru
‘I can’t be having with this.’ - Esmeralda Weatherwax
Reply



Messages In This Thread
RE: Green Energy Transmission Line Authorized - by BrianSoddingBoru4 - May 29, 2022 at 2:59 pm

Possibly Related Threads...
Thread Author Replies Views Last Post
  Free energy for realz! ignoramus 11 1911 November 26, 2019 at 7:49 am
Last Post: brewer
  Why do Rechargable Batteries Lose Their Capacity to Held Energy? Rhondazvous 6 1907 October 27, 2015 at 1:21 pm
Last Post: Angrboda



Users browsing this thread: 1 Guest(s)