RE: Green Energy Transmission Line Authorized
May 29, 2022 at 3:03 pm
(This post was last modified: May 29, 2022 at 3:03 pm by Anomalocaris.)
Did I misconstrue “ this will permit at least 25 gigawatts of solar, wind, and geothermal production on public lands by 2025”? How did I misconstrue it?
Perhaps without the line 24 gigawatts would have been possible? If so the lane certainly didn’t deserve the splashy news flash, no?
Perhaps without the line 24 gigawatts would have been possible? If so the lane certainly didn’t deserve the splashy news flash, no?