RE: German Nuclear Power Phaseout
January 4, 2020 at 1:46 pm
(This post was last modified: January 4, 2020 at 1:55 pm by Mr Greene.)
Originally, though I think that was one of the things altered by the Finns.
Two more sites;
Mocove Slovakia, VVER, 2016 one Level 1 event
Temelin Czech Rep. VVER, trying to decypher the events and I hope the number is wrong...
edit: 2007-2009 thirteen Level 1 events, 2018 one Level 1 event. Boy, do CEZ try to bury the safety report...
Two more sites;
Mocove Slovakia, VVER, 2016 one Level 1 event
Temelin Czech Rep. VVER, trying to decypher the events and I hope the number is wrong...
edit: 2007-2009 thirteen Level 1 events, 2018 one Level 1 event. Boy, do CEZ try to bury the safety report...
Quote:I don't understand why you'd come to a discussion forum, and then proceed to reap from visibility any voice that disagrees with you. If you're going to do that, why not just sit in front of a mirror and pat yourself on the back continuously?-Esquilax
Evolution - Adapt or be eaten.